Skip links

JCC of Stamford Renovation Update

The Stamford JCC was in need for a major renovation due to its outdated locker rooms. 100% of the interior of the men’s and women’s locker rooms were demolished and re-built. During demolition we discovered severe deterioration in the structure and old plumbing pipes completely rusted through. After tackling the mechanical and structural deficiencies, we were able to focus on the overall aesthetics of the new space. Some exciting features of the locker rooms are the State-Of-The-Art sauna and steam rooms that create a true spa-like feeling. Multi-textured wall tiles which spans the entire length of the locker room accentuates the spa-like atmosphere. All areas of the JCC are now ADA compliant with handicap accessible showers and bathroom stalls with room for an aid to accompany the member. For those who chose to swim, a swimsuit spin dyer is conveniently built-in to all locker rooms. Despite the COVID-19 pandemic, KARP was not slowed down and completed the project in 8 months. New ERV units were installed to double the capacity of air circulation for the renovated space. Warmly lit locker rooms bring out the canvas of monochrome greys and whites which offer a relaxing and inviting atmosphere post workout.